Stagg High School and District 230 staff attend weekly meetings with the contractor to review upcoming work, and Stagg will be sure to notify our community of any changes shared with the school.
-
Roadwork on 111th and Roberts Road will continue with temporary lane closures. In mid to late March, workers will begin removing pavement on the road which will require the closure of lanes for an extended period of time.
Note the first Entrance/Exit to the East Lot on Roberts Road is closed. Below you will find a map of traffic flow in the East Lot. All traffic in the morning and afternoon will need to enter and exit at the south end of the East Lot. The traffic in the East Lot is ONE WAY only.
As a reminder, park only in designated parking spots. Do not park in crosswalks or “lined out” areas in the parking lots. Overflow parking is available in the West Lot or in the Drivers’ Ed Range in the stadium.
We also advise the following:
-
STUDENTS AND FAMILIES SHOULD PLAN ACCORDINGLY. It will take more time to get on and off campus.
-
Using buses for transportation during this time may speed student arrival and departure.
-
Students who drive or are driven to school may want to consider ride sharing. Fewer cars on campus should improve congestion.
-
Cars cannot park and wait for students on Roberts Road or 111th Street.
-
Bus departure time may be delayed.
-
STUDENTS WHO WALK OR RIDE BIKES MUST USE CROSSWALKS WHEN CROSSING 111th or ROBERTS ROAD.
There are no resources or collections to display